Van Phong I BOT Thermal Power Plant Project
Other Albums
Transport and handle the Tunnel Boring Machine (TBM) of the Second Ho Chi Minh city Environmental Sanitation Project for Italian - Thai.
Receipt and transport of Tunnel Boring Machine (TMB) back to Ba Son job site preparing for the the second tunnel line.
Transport and position switch for 2 unit of main transformers 134 tons/each for the outage service for Phu My Power Plant.
Whole package door-to-door services for 3 main transformers 250MVA from Hiep Hoa sub-station, Bac Giang province to China.
Combination of water-to-road transport and hand-over 3 transformer 250MVA from Dong Anh Electrical Equipment Corporation to the Southern sub-stations.
Receipt, handling and transport the equipment for the Bim Son Cement Plant - Transformation of Technology Grinding and Packaging System.
Transport and delivery the Tunnel Boring Machine (TBM) for Contract Package 1A - Ho Chi Minh City Urban Railway Project - Line 1.
Shifting and transport service for 2 units of container RTG (Mitsui) from Tan Cang Cai Mep Deep Water port, Ba Ria - Vung Tau to Tan Cang Cat Lai, HCM city.
Transport and Installation of whole equipment for the Flight Training Centre Construction Project of Vietnam Airlines.
Arrangement of personnel and special equipment to receive, transport and hand over the Generator Rotor for the maintenance services of Phu My 4 Power Plant.