{"id":2353,"date":"2026-11-05T08:36:35","date_gmt":"2026-11-05T01:36:35","guid":{"rendered":"https:\/\/vgt.com.vn\/du-an\/vgt-van-chuyen-lng-koh-kong-shipment-4"},"modified":"2026-11-05T11:23:36","modified_gmt":"2026-11-05T04:23:36","slug":"vgt-koh-kong-lng-shipment-4-equipment-transport","status":"publish","type":"project","link":"https:\/\/vgt.com.vn\/en\/vgt-koh-kong-lng-shipment-4-equipment-transport","title":{"rendered":"VGT Handles Shipment 4 for the Koh Kong LNG Project: Four Equipment Units Totaling 960 Tonnes"},"content":{"rendered":"<p>Continuing its operations at the Koh Kong LNG Power Plant and Terminal Project in Cambodia, Vietnam Global Transport Corporation (VGT) is carrying out Shipment 4, comprising <strong>four equipment units with a combined weight of 960 tonnes<\/strong>. The scope covers transportation from Sihanoukville Port to the project site, combining barge transport with specialized heavy-haul trailers.<\/p>\n<figure id=\"attachment_2347\" aria-describedby=\"caption-attachment-2347\" style=\"width: 4000px\" class=\"wp-caption alignnone\"><img decoding=\"async\" class=\"wp-image-2347 size-full\" src=\"https:\/\/vgt.com.vn\/wp-content\/uploads\/2026\/11\/lng-shipment-4-18.webp\" alt=\"Aerial view of the equipment cargo aboard a barge at the port.\" width=\"4000\" height=\"2250\" title=\"- VGT - Gi\u1ea3i ph\u00e1p v\u1eadn t\u1ea3i v\u00e0 logistics to\u00e0n di\u1ec7n cho doanh nghi\u1ec7p\" srcset=\"https:\/\/vgt.com.vn\/wp-content\/uploads\/2026\/11\/lng-shipment-4-18.webp 4000w, https:\/\/vgt.com.vn\/wp-content\/uploads\/2026\/11\/lng-shipment-4-18-300x169.webp 300w, https:\/\/vgt.com.vn\/wp-content\/uploads\/2026\/11\/lng-shipment-4-18-1924x1082.webp 1924w, https:\/\/vgt.com.vn\/wp-content\/uploads\/2026\/11\/lng-shipment-4-18-768x432.webp 768w, https:\/\/vgt.com.vn\/wp-content\/uploads\/2026\/11\/lng-shipment-4-18-1536x864.webp 1536w, https:\/\/vgt.com.vn\/wp-content\/uploads\/2026\/11\/lng-shipment-4-18-2048x1152.webp 2048w, https:\/\/vgt.com.vn\/wp-content\/uploads\/2026\/11\/lng-shipment-4-18-1200x675.webp 1200w\" sizes=\"(max-width: 4000px) 100vw, 4000px\" \/><figcaption id=\"caption-attachment-2347\" class=\"wp-caption-text\">Aerial view of the equipment cargo aboard a barge at the port.<\/figcaption><\/figure>\n<h2>Four Equipment Units, with the Heaviest Weighing 420 Tonnes<\/h2>\n<p>Shipment 4 comprises a 420-tonne gas turbine, a 310-tonne generator stator, a 160-tonne steam turbine and a 70-tonne generator rotor. Given the substantial weight of these power generation components, the transport arrangements are tailored to each unit, from equipment selection to the organization of on-site transportation.<\/p>\n<h2>Barge Transportation from Sihanoukville to the Project<\/h2>\n<p>At Sihanoukville Port, VGT receives the four equipment units and arranges their loading onto <strong>one barge<\/strong>. The cargo is then transported to the jetty within the LNG project area, where load-in and subsequent on-site transportation take place.<\/p>\n<p>Using a single barge for the entire shipment connects the port handling plan with the cargo handling sequence at the destination. For this 960-tonne consignment, coordination between the barge and specialized trailer configurations is essential to maintaining continuity across the transport stages.<\/p>\n<figure id=\"attachment_2329\" aria-describedby=\"caption-attachment-2329\" style=\"width: 1672px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" class=\"wp-image-2329 size-full\" src=\"https:\/\/vgt.com.vn\/wp-content\/uploads\/2026\/11\/lng-shipment-4-4.webp\" alt=\"Equipment units positioned aboard the barge for waterborne transportation.\" width=\"1672\" height=\"941\" title=\"- VGT - Gi\u1ea3i ph\u00e1p v\u1eadn t\u1ea3i v\u00e0 logistics to\u00e0n di\u1ec7n cho doanh nghi\u1ec7p\" srcset=\"https:\/\/vgt.com.vn\/wp-content\/uploads\/2026\/11\/lng-shipment-4-4.webp 1672w, https:\/\/vgt.com.vn\/wp-content\/uploads\/2026\/11\/lng-shipment-4-4-300x169.webp 300w, https:\/\/vgt.com.vn\/wp-content\/uploads\/2026\/11\/lng-shipment-4-4-768x432.webp 768w, https:\/\/vgt.com.vn\/wp-content\/uploads\/2026\/11\/lng-shipment-4-4-1536x864.webp 1536w, https:\/\/vgt.com.vn\/wp-content\/uploads\/2026\/11\/lng-shipment-4-4-1200x675.webp 1200w\" sizes=\"(max-width: 1672px) 100vw, 1672px\" \/><figcaption id=\"caption-attachment-2329\" class=\"wp-caption-text\">Equipment units positioned aboard the barge for waterborne transportation.<\/figcaption><\/figure>\n<h2>Dedicated Transport Arrangements for Each Equipment Unit<\/h2>\n<p>At the project jetty, VGT carries out load-in from the barge to shore, followed by transportation into the site and cargo set-down. Trailer configurations are assigned to suit each unit, with the gas turbine and generator stator representing the two heaviest loads.<\/p>\n<h3>420-Tonne Gas Turbine: Transportation by Nicolas Trailer<\/h3>\n<p>The 420-tonne gas turbine is transported into the site using a <strong>Nicolas trailer<\/strong>. As the heaviest unit in Shipment 4, this movement requires close coordination between the transport configuration, route conditions and field operations.<\/p>\n<figure id=\"attachment_2317\" aria-describedby=\"caption-attachment-2317\" style=\"width: 1672px\" class=\"wp-caption alignnone\"><img decoding=\"async\" class=\"size-full wp-image-2317\" src=\"https:\/\/vgt.com.vn\/wp-content\/uploads\/2026\/11\/lng-shipment-4-9.webp\" alt=\"A specialized heavy-haul trailer combination transporting equipment along the internal access route to the project.\" width=\"1672\" height=\"941\" title=\"- VGT - Gi\u1ea3i ph\u00e1p v\u1eadn t\u1ea3i v\u00e0 logistics to\u00e0n di\u1ec7n cho doanh nghi\u1ec7p\" srcset=\"https:\/\/vgt.com.vn\/wp-content\/uploads\/2026\/11\/lng-shipment-4-9.webp 1672w, https:\/\/vgt.com.vn\/wp-content\/uploads\/2026\/11\/lng-shipment-4-9-300x169.webp 300w, https:\/\/vgt.com.vn\/wp-content\/uploads\/2026\/11\/lng-shipment-4-9-768x432.webp 768w, https:\/\/vgt.com.vn\/wp-content\/uploads\/2026\/11\/lng-shipment-4-9-1536x864.webp 1536w, https:\/\/vgt.com.vn\/wp-content\/uploads\/2026\/11\/lng-shipment-4-9-1200x675.webp 1200w\" sizes=\"(max-width: 1672px) 100vw, 1672px\" \/><figcaption id=\"caption-attachment-2317\" class=\"wp-caption-text\">A specialized heavy-haul trailer combination transporting equipment along the internal access route to the project.<\/figcaption><\/figure>\n<h3>310-Tonne Generator Stator: 24 Goldhofer Axle Lines in a Side-by-Side Configuration<\/h3>\n<p>For the 310-tonne generator stator, VGT deploys <strong>24 Goldhofer axle lines in a side-by-side configuration<\/strong> for transportation into the site. This arrangement forms part of the unit-specific transport plan, connecting jetty handling with the project&#8217;s internal transport route.<\/p>\n<h3>160-Tonne Steam Turbine and 70-Tonne Generator Rotor: 12 Goldhofer Axle Lines<\/h3>\n<p>The remaining two units are transferred from the barge to shore using a <strong>12-axle-line Goldhofer configuration<\/strong>. Together with the Nicolas trailer and the 24-axle-line Goldhofer side-by-side arrangement, this configuration forms the transport equipment fleet serving all four units in the shipment.<\/p>\n<h2>Moving Equipment into the Plant Area<\/h2>\n<p>Following the waterborne transport leg, VGT&#8217;s scope continues with on-site transportation and cargo set-down. This stage connects transport operations with equipment positioning within the project area and requires coordination between the transport crews and other teams working in the same location.<\/p>\n<figure id=\"attachment_2341\" aria-describedby=\"caption-attachment-2341\" style=\"width: 1672px\" class=\"wp-caption alignnone\"><img decoding=\"async\" class=\"size-full wp-image-2341\" src=\"https:\/\/vgt.com.vn\/wp-content\/uploads\/2026\/11\/lng-shipment-4-15.webp\" alt=\"The transport convoy moving equipment through the plant construction area.\" width=\"1672\" height=\"941\" title=\"- VGT - Gi\u1ea3i ph\u00e1p v\u1eadn t\u1ea3i v\u00e0 logistics to\u00e0n di\u1ec7n cho doanh nghi\u1ec7p\" srcset=\"https:\/\/vgt.com.vn\/wp-content\/uploads\/2026\/11\/lng-shipment-4-15.webp 1672w, https:\/\/vgt.com.vn\/wp-content\/uploads\/2026\/11\/lng-shipment-4-15-300x169.webp 300w, https:\/\/vgt.com.vn\/wp-content\/uploads\/2026\/11\/lng-shipment-4-15-768x432.webp 768w, https:\/\/vgt.com.vn\/wp-content\/uploads\/2026\/11\/lng-shipment-4-15-1536x864.webp 1536w, https:\/\/vgt.com.vn\/wp-content\/uploads\/2026\/11\/lng-shipment-4-15-1200x675.webp 1200w\" sizes=\"(max-width: 1672px) 100vw, 1672px\" \/><figcaption id=\"caption-attachment-2341\" class=\"wp-caption-text\">The transport convoy moving equipment through the plant construction area.<\/figcaption><\/figure>\n<h2>Continuing Project Logistics Operations at Koh Kong LNG<\/h2>\n<p>Through Shipment 4, VGT continues to undertake an integrated scope of work, from receiving equipment at Sihanoukville Port to transportation and set-down at the Koh Kong LNG project site. The combination of barge transport, Nicolas trailers and Goldhofer configurations reflects a transport approach tailored to the requirements of each cargo unit and each stage of the operation.<\/p>\n<p>The 960-tonne shipment represents another significant transport assignment within VGT&#8217;s involvement in the project, demonstrating its scope of <strong>oversized and heavy cargo transportation services<\/strong> for energy developments in Cambodia.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>VGT handles four equipment units totaling 960 tonnes for Shipment 4 of the Koh Kong LNG project, combining barge transport with Nicolas and Goldhofer heavy-haul trailers.<\/p>\n","protected":false},"featured_media":2343,"template":"","meta":{"inline_featured_image":false,"footnotes":""},"project_category":[25],"project_tag":[],"class_list":["post-2353","project","type-project","status-publish","has-post-thumbnail","hentry","project_category-power-generation"],"_links":{"self":[{"href":"https:\/\/vgt.com.vn\/en\/wp-json\/wp\/v2\/project\/2353","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vgt.com.vn\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/vgt.com.vn\/en\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":3,"href":"https:\/\/vgt.com.vn\/en\/wp-json\/wp\/v2\/project\/2353\/revisions"}],"predecessor-version":[{"id":2357,"href":"https:\/\/vgt.com.vn\/en\/wp-json\/wp\/v2\/project\/2353\/revisions\/2357"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vgt.com.vn\/en\/wp-json\/wp\/v2\/media\/2343"}],"wp:attachment":[{"href":"https:\/\/vgt.com.vn\/en\/wp-json\/wp\/v2\/media?parent=2353"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/vgt.com.vn\/en\/wp-json\/wp\/v2\/project_category?post=2353"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/vgt.com.vn\/en\/wp-json\/wp\/v2\/project_tag?post=2353"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}