{"id":1869,"date":"2026-06-02T17:35:24","date_gmt":"2026-06-02T10:35:24","guid":{"rendered":"https:\/\/vgt.com.vn\/du-an\/vgt-khang-dinh-nang-luc-tai-sieu-du-an-bot-nhiet-dien-vung-ang-2-1330mw"},"modified":"2026-06-05T16:55:09","modified_gmt":"2026-06-05T09:55:09","slug":"vung-ang-2-power-plant-heavy-lift-logistics","status":"publish","type":"project","link":"https:\/\/vgt.com.vn\/en\/vung-ang-2-power-plant-heavy-lift-logistics","title":{"rendered":"VGT proves its capabilities at the Vung Ang 2 BOT Thermal Power mega-project (1,330MW)"},"content":{"rendered":"<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\"><strong>VIETNAM GLOBAL TRANSPORT CORPORATION (VGT)<\/strong> is proud to have successfully delivered a turnkey transportation service for one of the largest key energy projects in Central Vietnam today: the Vung Ang 2 BOT Thermal Power Plant (total capacity 1,330MW).<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">The project is strategically located in the Vung Ang Economic Zone, Vung Ang Ward, Ha Tinh Province, and is invested by Vung Ang II Thermal Power Limited Liability Company (VAPCO). Serving as the strategic logistics partner of leading international contractor DOOSAN ENERBILITY, alongside KWANGJIN TLS, VGT once again affirmed its leading position in multimodal transportation of oversized and overweight cargo (Project Logistics &amp; Heavy Lifts) in Vietnam.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">For a mega-project with stringent technical standards and a demanding schedule like Vung Ang 2, VGT demonstrated outstanding capabilities by providing a turnkey solution covering customs clearance, long-haul transportation, and precise installation onto foundations.<\/p>\n<h3 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\">Multimodal oversized &amp; overweight transportation \u2013 Absolute safety<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">VGT undertook the entire transportation process for imported and domestic cargo, machinery and equipment, from key maritime gateways including Hai Phong Port and Vung Ang Port to the project site.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">The highlight that affirmed the outstanding capabilities of VGT&#8217;s engineering team and specialized equipment fleet was the successful transportation of the project&#8217;s extraordinary out-of-gauge (OOG) heavy-lift units, most notably:<\/p>\n<ul class=\"[li_&amp;]:mb-0 [li_&amp;]:mt-1 [li_&amp;]:gap-1 [&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc flex flex-col gap-1 pl-8 mb-3\">\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\">02 Generator Step-Up Transformers (GSUT): weighing up to 403 tons per unit;<\/li>\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\">02 Generator Stators: weighing up to 343 tons per unit.<\/li>\n<\/ul>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">To move these multi-hundred-ton loads safely across public roads, VGT&#8217;s engineers conducted in-depth technical surveys and detailed assessments of the load-bearing capacity of road and bridge infrastructure, then mobilized specialized vehicles together with dedicated hydraulic modular trailers to optimize the transport plan.<\/p>\n<h3 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\">Skidding &amp; installation onto foundations<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Going beyond transportation, VGT&#8217;s turnkey service also provided high-precision heavy-lift installation solutions. At the Vung Ang 2 site, VGT&#8217;s experienced specialists directly carried out:<\/p>\n<ul class=\"[li_&amp;]:mb-0 [li_&amp;]:mt-1 [li_&amp;]:gap-1 [&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc flex flex-col gap-1 pl-8 mb-3\">\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\">The skidding operation, successfully installing the super-heavy GSUT transformers from the transport vehicles onto their foundations with absolute safety;<\/li>\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\">Precise technical alignment in strict accordance with structural design documents and the manufacturer&#8217;s standards, ensuring the equipment was in perfect condition and ready for connection and commissioning.<\/li>\n<\/ul>\n<h3 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\">Comprehensive customs &amp; legal solutions<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">Completing the end-to-end supply chain, VGT&#8217;s customs services helped the client thoroughly resolve schedule challenges and optimize costs:<\/p>\n<ul class=\"[li_&amp;]:mb-0 [li_&amp;]:mt-1 [li_&amp;]:gap-1 [&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc flex flex-col gap-1 pl-8 mb-3\">\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\">Surveying, advising and handling the complete import duty exemption procedures for the project&#8217;s entire list of goods and equipment;<\/li>\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\">Managing seamless import customs clearance for 100% of the equipment, machinery and materials serving construction, keeping cargo flowing continuously without disrupting the overall site schedule.<\/li>\n<\/ul>\n<h3 class=\"text-text-100 mt-2 -mb-1 text-base font-bold\">Closing message<\/h3>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">The success at the Vung Ang 2 BOT Thermal Power mega-project once again clearly demonstrates our brand philosophy: <strong>&#8220;With us the load seems smaller&#8221;<\/strong> \u2014 with VGT, every transportation burden becomes lighter and easier. We are committed to continuing to accompany investors and general contractors, both domestic and international, to deliver logistics solutions that are most cost-effective, technically safest, and outstanding in schedule performance.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">VGT sincerely thanks the Investor VAPCO, together with our two distinguished partners DOOSAN ENERBILITY and KWANGJIN TLS, for their trust and close cooperation throughout the project!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>VIETNAM GLOBAL TRANSPORT CORPORATION (VGT) is proud to have successfully delivered a turnkey transportation service for one of the largest key energy projects in Central Vietnam today: the Vung Ang&#8230;<\/p>\n","protected":false},"featured_media":1617,"template":"","meta":{"inline_featured_image":false,"footnotes":""},"project_category":[25],"project_tag":[],"class_list":["post-1869","project","type-project","status-publish","has-post-thumbnail","hentry","project_category-power-generation"],"_links":{"self":[{"href":"https:\/\/vgt.com.vn\/en\/wp-json\/wp\/v2\/project\/1869","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vgt.com.vn\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/vgt.com.vn\/en\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":2,"href":"https:\/\/vgt.com.vn\/en\/wp-json\/wp\/v2\/project\/1869\/revisions"}],"predecessor-version":[{"id":1871,"href":"https:\/\/vgt.com.vn\/en\/wp-json\/wp\/v2\/project\/1869\/revisions\/1871"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vgt.com.vn\/en\/wp-json\/wp\/v2\/media\/1617"}],"wp:attachment":[{"href":"https:\/\/vgt.com.vn\/en\/wp-json\/wp\/v2\/media?parent=1869"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/vgt.com.vn\/en\/wp-json\/wp\/v2\/project_category?post=1869"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/vgt.com.vn\/en\/wp-json\/wp\/v2\/project_tag?post=1869"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}